Stud Elongation Measurement System

Problem:

During nuclear power plant reactor refueling several technicians must spend 10-16 hours in highly reactive environment, meticulously collect collecting stud measurement information.

Solution:

We designed a custom battery powered instrument that collected, stored and printed the measurement of each stud. This new instrument reduced exposure time to 10%-25% of the previous time.

« Back to Projects

JLD Systems, LTD
3545 Marietta Avenue • Suite R • Lancaster, PA 17601
Toll-Free Phone: 888-553-7978 • Phone: (717) 892-1100
Contact Us

©2008, JLD Systems, LTD. All Rights Reserved.